Project Update 10/31/19

  • Dune Fencing Installation – Crews continue installing the remaining dune fencing posts along the east side of A1A along the back side of the sidewalk. Crews are working between Atlantic Ave. and Beach Drive.
  • Pedestrian Light Poles – Work continues on the new lighting on the beach side of A1A. Crews began installing the new light fixtures on the poles beginning on the North End at Beach Drive and continuing to the south. Crews are also installing the new electrical wiring and conduits. This work will continue thru Friday and into next week. This work will have minimal impact to pedestrian traffic along the east side of A1A.