Project Update 10/30/19

  • Dune Fencing Installation – Crews continue installing the remaining dune fencing posts along the east side of A1A along the back side of the sidewalk. Crews are working between Thomas St. and the north end crosswalk.
  • Pedestrian Light Poles – Crews continue installing the new light poles along the sidewalk on the beach side of A1A. 80% of the poles have been installed. Crews are installing the remaining poles near the Beach Access entrances. Pedestrian traffic along the sidewalk may encounter brief sidewalk closures as the crew sets the new light poles into the ground. Parking spaces along A1A may at times be marked NO PARKING while crews install the new light poles. Once completed, those spaces will be reopened.
  • Roadway Improvements – The contractor is installing the electrical conduits which will power the new lighting along the sidewalks. The crew has started on the north end near Beach Drive and is moving south. This work takes place in the parkways and should have minimal impact to pedestrian traffic.