Project Update 8/22/2019

Roadway Improvements:
Atlantic Ave. and Venetian Dr. Intersection Improvements:

  • Tomorrow, Friday, August 22nd  – The Center Lanes at the intersection will be closed and the contractor will remove the existing asphalt and install a new asphalt base. All lanes will be reopened before 7:00 PM.

 

  • Monday, August 26th  – The south section of the intersection and the outside east bound lane will be closed. Traffic wanting to use Venetian Dr. will be detoured to Gleason St. and Miramar St. back to Venetian Dr. Follow the detour signs. The contractor will be removing the existing brick pavers, excavating the roadway, and installing a new asphalt base. Venetian Dr. will be reopened before 7:00 PM.

 

The schedule of the planned work is weather dependent and is subject to change.