Construction Update 8/28/2019

Atlantic/A1A Ocean Blvd. Intersection

  • Thursday, 8/29/19 – The contractor will finish removing the brick pavers and replacing with new asphalt. The Contractor will also place the new ADA Ramps on the beach side of A1A.
  • Friday, 8/30/19 – The contractor will install new detectable warning pavers in the new ADA sidewalk ramps on the beach side of A1A. Also, full cleanup of the site and removal of all maintenance of traffic control devices will be done in preparation of Hurricane Dorian.
  • Two-way traffic (north and south) on A1A Ocean Blvd. will be maintained during the intersection work. The intersection will be reopened at the end of the work day. Expect traffic delays during construction.
  • Please drive carefully through the construction zone and watch for equipment and workers.